Install lift cylinder cables to the track shoe, Caution, Warning – Wheatheart X160 Series User Manual

Page 74

Advertising
background image

3. A

SSEMBLY

W

HEATHEART

- G

RAIN

A

UGERS

X160-85, X160-105, X160-125

74

30875 R0

3.8. INSTALL LIFT CYLINDER CABLES TO THE TRACK

SHOE

Note:

Although the lift cable is factory installed on the cylinder, make sure that the

cable clamps on the cylinder are secure and the cables are properly seated in

the cable sheaves before attaching the cable to the track shoe.
1. Ensure that all cylinders are in full down position, and that track shoe is

resting against the track stop.

2. Thread the lift cables around the circular cable beds on the outside edges of

the cable-attach rod on the track shoe (three lift cables for the X160-85, and

two lift cables for the X160-105/125 models).

3. Pull the cables very tight, then secure with cable clamps on each cable (see

Figure 3.29 for an example using the X160-85).

CAUTION

Track shoe must rest against track stop when

adjusting cable.
If this isn’t done, the auger can raise higher

than designed to lift, resulting in damage to

auger and possible injury to personnel.

WARNING

Unroll and straighten lift cables carefully

during installation. Ensure that there are no

kinks, loops, twists, or any visible defect in the

cables. Discard and replace cables that have

any visible defect.
Do not unroll cables on the ground or

otherwise expose cables to dirt or grit. Wipe

cables with a clean cloth to ensure that any

grit is removed before installation.

Advertising