Spot air cart, Install cab components, Spot air cart install cab components – Great Plains 3N4010HDA Predelivery Manual User Manual

Page 11: Caution, Bf l r

Advertising
background image

Great Plains Manufacturing, Inc.

Air Cart Pre-Delivery

9

10/10/2008

196-444Q

Spot Air Cart

Choose an assembly location with ample room. Allowing
room for turns, the complete assembly of tractor, drill and
air cart may require a space with a:

length over 100 feet (30m) and
width of 50 feet (15m) without markers, or
width of 83 feet (25m) with markers.

!

CAUTION

Check for overhead lines, particularly if the drill will have
markers. The air cart requires at least 12ft (7.6m) vertically,
and more if auger deployment is contemplated.

Refer to Figure 5

20. Move the air cart

to the final assembly area.

Block the wheels.

21. Verify that the cart has the correct sprocket for the

drill. See “Cart Drive System” in the Air Cart Opera-
tor manual.

Install Cab Components

If the customer tractor is available, install the Seed Moni-
tor in the tractor cab. This is described under “Prepara-
tion and Setup
” in the Air Cart Operator manual.

Figure 5

Assembly Clearances

(without markers)

40 ft

10.2m

70 ft

21.3m

1

B

F

L

R

1

Advertising