Blockage harness routing, Install hitch harness, Harness id – Great Plains 3N4010HDA Predelivery Manual User Manual

Page 37: Fb r l

Advertising
background image

Great Plains Manufacturing, Inc.

Air Drill Pre-Delivery

35

10/10/2008

196-444Q

Blockage Harness Routing

Install Hitch Harness

Refer to Figure 45, Figure 46 and Figure 47 (next page)

116. Select one:

467980130 40’ HITCH HARNESS

This harness is supplied with the air cart, and not
with the drill or blockage kit. it may already be
installed on the drill; if so, the rear end may merely
require re-routing.

The hitch end has a single circular connector. The
rear end has two connectors (the same power/CAN
bus receptacles as WSMB harnesses).

117. Select several ties. Start plug end of harness

at

the front drill hitch, leaving slack for tractor hitching.
Route it along the left tongue, and then to Tower 1
(left tower, left wing). Connect power and CAN con-
nectors at Tower 1 WSMB.

Secure hitch harness with ties every few feet (every
meter or so). Additional ties are added later.

Figure 45

Harness Routing (for Blockage only)

28202

F

B

R

L

68

69

95

96

70

1

2

3

4

5

6

Harness ID

Callout

Part

Number

Description

467980130

40’ HITCH HARNESS

467980141

10’ EXT HARNESS

467980360

3’ REAR HITCH HARNESS

467751320S1 12 ROW HARNESS

467980140

DJ 20’ HARNESS EXT

467980143

INT AG 25’ HARNESS, WSMB EXT

467981201

INT AG HARNESS, WSMB MODULE

68

69

70

94

95

96

98

69

94

98

98

98 98

98

98

94

94

94

94

94

Figure 46

Hitch Harness

27080

68

68

68

Advertising