Route monitor harness, Monitor harness without blockage – Great Plains 3N4010HDA Predelivery Manual User Manual

Page 32

Advertising
background image

30

3N-4010HDA and ADC2350B

Great Plains Manufacturing, Inc.

196-444Q

10/10/2008

Route Monitor Harness

If the drill was ordered with blockage detection, skip to
Install Blockage Detectors (Option)” on page 31. Step
92 through step 96 are f
or a drill without detection.

Monitor Harness without Blockage

Refer to Figure 32

92. Select one:

467980130 40’ HITCH HARNESS

If

is not quickly located in a crate, check to see if

it is already installed on the drill. In either case, iden-
tify the plug (tractor) end of this cable, which has a
single connector (the rear end has two connectors).

Refer to Figure 34

93. Start plug end at the front drill hitch, leaving slack for

tractor hitching. Route it along the left tongue.

94. Select one:

467980141 10’ EXT HARNESS

If

is not quickly located in a crate, check to see if

it is already installed on the drill.

Mate this extension

to the 40ft harness

just

installed. Route it through the hoop at the wing pivot
to main frame center.

95. Select one:

467980360 3’ REAR HITCH HARNESS

Connect one end of rear harness

to the extension

. Route this harness to the rear hitch bulkhead

secure it to the last available large mounting hole in
the hose bracket installed at step 57.

96. Select all remaining ties. Secure all hoses and

cables with ties, including the lift switch cable

at

the rear hitch. Leave enough slack for it to connect to
the small bulkhead on the cart tongue.

Figure 32

Hitch Harness

27080

68

Figure 33

Implement Harness Routing (without Blockage Detection)

28188
28189

68

69

69

73

68

68

Figure 34

Harness Route (w/o Blockage)

27031

68

69

70

69

69

69

68

70

70

69

73

76

Advertising