Tower elevation, Install tower mounts, Tower elevation install tower mounts – Great Plains 3N4010HDA Predelivery Manual User Manual

Page 23: Figure 18, Figure 19, Wer height (figure 18), Ud r l

Advertising
background image

Great Plains Manufacturing, Inc.

Air Drill Pre-Delivery

21

10/10/2008

196-444Q

Tower Elevation

Install Tower Mounts

Start with the outside tower

on the left wing.

Refer to Figure 19, Figure 18 and Figure 17 on page 20

63. Select two each:

168-362D NTA35 DIST TOWER MOUNT
806-155C U-BOLT 1/2-13 X 4 1/32 X 3 1/4

and four (4) sets:

804-015C WASHER LOCK SPRING 1/2 PLT
803-020C NUT HEX 1/2-13 PLT

Install both mounts

to the top of the 4x2in rear

frame tube, with the longer leg of the angle mount
facing forward. See “Lateral Tower Location (Fig-
ure 17)
” table on page 20 f
or placements from near-
est tool bar end.

Figure 18

Tower Elevation, Left Wing

28204

U

D

R

L

x

y

z

Figure 19

Tower Mounts, Left Wing

27058

16

78

50

39

U

D

F

B

L

R

1

16

78

50

39

16

Advertising