Spot implements, Check drill level, Locate parts – Great Plains 3N4010HDA Predelivery Manual User Manual

Page 15: Spot implements check drill level locate parts, Caution, Bf l r

Advertising
background image

Great Plains Manufacturing, Inc.

Air Drill Pre-Delivery

13

10/10/2008

196-444Q

Spot Implements

Choose an assembly location with ample room. Allowing
room for turns, the complete assembly of tractor, drill and
air cart may require a space with a:

length over 100 feet (30m) and
width of 50 feet (15m) without markers, or
width of 83 feet (25m) with markers.

!

CAUTION

Check for overhead lines, particularly if the drill will have
markers. The air cart requires at least 12ft (7.6m) vertically,
and more if auger deployment is contemplated.

Refer to Figure 9

30. Move the air cart

to the final assembly area.

Block the wheels.

31. Fold the drill.

32. Move the drill

to the final assembly area, about 9 ft

(1m) in front of the pintle ring of the air cart.

33. Raise the drill off the lock channels.

Unfold the drill.

34. Remove the lock channels (six).

Lower the drill.

Check Drill Level

35. Refer to the drill Operator manual and check topics:

Opener Frame Height”,
Side-to-Side Level”,
Front-to-Back Level” and
Section Alignment

Locate Parts

36. Review the Parts Lists beginning on page 39. Deter-

mine which crates or cartons contain the items.

37. Locate all cable ties, and gather them at one spot.

Set this size apart from the others:

800-082C CABLE TIE .31X21.5 6DIA 120LB

Use these only when specifically called by part num-
ber.

Figure 9

Assembly Clearances

(without markers)

40 ft

10.2m

70 ft

21.3m

2

1

B

F

L

R

1

2

83

Advertising