Great Plains 3N4010HDA Predelivery Manual User Manual

Page 2

Advertising
background image

196-444Q

10/10/2008

Table of Contents

©

Copyright 2008. All rights Reserved.

Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been taken in the preparation
of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed for damages resulting from the use of the infor-
mation contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products as it sees fit. This publication describes the state of this product at
the time of its publication, and may not reflect the product in the future.

Great Plains Manufacturing, Incorporated Trademarks

The following are trademarks of Great Plains Mfg., Inc.: Application Systems, Ausherman, Land Pride, Great Plains

All other brands and product names are trademarks or registered trademarks of their respective holders.

Printed in the United States of America.

3N-4010HDA and ADC2350B

Great Plains Manufacturing, Inc.

Important Safety Information.................................... 1
Introduction ................................................................ 4
Implements Covered.................................................... 4

Document Family ..........................................................4
Definitions .....................................................................4

Assembly and Setup Assistance.................................. 5
Air Cart Pre-Delivery.................................................. 6
Air Cart Preparation ..................................................... 6

Cart Assembly Summary...............................................6

Tools Required............................................................. 6
Cart Pre-Assembly Checklist ....................................... 6
Unload Air Cart ............................................................ 7

Lift Air Cart on Truck .....................................................7

Locate Parts................................................................. 7
Install Wheels............................................................... 8
Spot Air Cart ................................................................ 9
Install Cab Components............................................... 9
Air Drill Pre-Delivery ................................................ 10
Drill Preparation ......................................................... 10

Drill Assembly Summary .............................................10

Tools Required........................................................... 10
Drill Pre-Assembly Checklist...................................... 10
Unload Truck.............................................................. 11
Remove Shipping Wheels.......................................... 12
Spot Implements ........................................................ 13
Check Drill Level ........................................................ 13
Locate Parts............................................................... 13
Drill Assembly ............................................................ 14

Install Markers (Option)...............................................14
Install Weight Brackets ...............................................14

Install Std. Outer Brackets...........................................14
Install Std. Mid-Wing Brackets.....................................15
Install Optional Brackets..............................................16

Attach Rear Hitch ........................................................17

Install Hose Connection Bulkhead...............................18
Mount Pintle Hook .......................................................18
Install Hydraulic Hoses ................................................19

Install Towers ..............................................................20

Dimensions..................................................................20

Lateral Tower Location (Figure 17) ........................ 20
Tower Inlet Angle (Figure 17) ................................ 20
Tower Height (Figure 18) ....................................... 20

Tower Elevation...........................................................21
Install Tower Mounts ...................................................21
Install Tower Weldments .............................................23

Install Primary Hoses.................................................. 24

Bulkhead Port ........................................................ 24
Primary Hose Length ............................................. 24

Install Secondary Hoses ............................................. 25

Port Numbering Convention ........................................25
Port Assignments, 10in (25.4cm) Drill .........................26
Port Assignments, 7.5in (19.2cm) Drill ........................27

Install Lift Switch ......................................................... 29
Route Lighting Cable .................................................. 29
Route Monitor Harness............................................... 30

Monitor Harness without Blockage ..............................30

Install Blockage Detectors (Option) ............................ 31

Install WSMBs .............................................................31
Prepare Hoses for Sensors .........................................32
Install Blockage Sensors .............................................32
Mount Row Harnesses ................................................33
Connect Sensors to Row Harnesses...........................33
Install WSMB Harnesses.............................................34
Interconnect WSMB Section Harnesses .....................34
Blockage Harness Routing ..........................................35

Harness ID............................................................. 35

Install Hitch Harness....................................................35
Install Left-Center Extension .......................................36
Install Center-Right Extension .....................................36
Install Right-Rear Extension ........................................36
Install Rear Hitch Extension ........................................36

Install Press Wheels ................................................... 37
Install Options ............................................................. 37

Hold-Down Kits............................................................37

Hitch Air Cart to Drill .................................................. 37
Appendix .................................................................. 38
Torque Chart ............................................................. 38
Parts Lists.................................................................. 39

Parts Supplied with Drill or Air Cart ....................... 39

Parts Supplied with ADC2350B Air Cart..................... 40

Parts in 823-274C Kit ..................................................40

Parts Supplied with Blockage Monitors ...................... 41

Parts in 823-282C and 823-283C Kits.........................41

Abbreviations............................................................. 42

Advertising