Unload truck – Great Plains 3N4010HDA Predelivery Manual User Manual

Page 13

Advertising
background image

Great Plains Manufacturing, Inc.

Air Drill Pre-Delivery

11

10/10/2008

196-444Q

Unload Truck

The 3N-4010HDA is normally ordered with an air cart,
and delivered on two flatbed trucks. Un-installed compo-
nents may be on the drill truck (single-truck delivery), the
air cart truck, or on a separate truck.

Note: The 3N-4010HDA is loaded for dock delivery.

Do not hoist or fork lift.

Refer to Figure 6

13. Verify that the fold lock is engaged. The drill cannot

safely be removed from the truck with the tooth of the
lock withdrawn.

14. Retrieve the Operator Manual from the manual pak,

located just forward of the left rear transport wheel.

15. Remove any un-installed components from the drill

truck. Do not install any of these while the drill is still
on the truck.

16. Mechanically hitch a suitable tractor to the drill. Refer

to “Hitching to Tractor” in the drill Operator Manual
for hitching details. Electrical connections are not
required.

Note: The un-assembled drill may weigh nearly 30,000

pounds (14000 kg).

Only one hydraulic circuit is required for unload, but
two are required for assembly.

17. Set the tractor parking brakes. Connect the drill’s lift

hydraulic circuit (color coded Blue) to a tractor
remote. Release chains and cargo straps securing
the drill.

18. Engage the lift circuit to raise the drill off any ship-

ping stands on the truck. Remove the shipping
stands (these are returned to Great Plains).

Refer to Figure 6

19. Carefully tow the drill off the truck bed.

Figure 6

Fold Lock Engaged

28176

Figure 7

Drill Unloaded and Lowered

28175

Advertising