Engage/disengage levers, Unload bins rack – Great Plains ADC2220 Predelivery Manual User Manual
Page 18

167-088Q-RUS
3/3/2006
ADC2220 & NTA 3510
16
23450
Clutch Linkage Rod
Engage/Disengage Lever
23045
Engage/Disengage
Lever
Clutch
Linkage
Rod
Engage/Disengage Levers
Refer to Figure 22
1.
Remove flat washer and lock nut from bolt on clutch
linkage rod.
2.
Secure linkage rod to lever with flat washer and lock
nut.
NOTE: Leave bolts secured loosely. Do NOT tighten
bolts down as levers will not function properly. Refer to
Figure 22.
Unload Bins Rack
Refer to Figure 23
NOTE: The air drill cart and air drill implement are
shipped on racks via containers. There are three
racks total: the center section rack, the wing rack,
and the bins rack.
1.
Unload all loose pieces from bins rack. Keep all
pieces separate. NOTE: DO NOT try to un-
load weight brackets from rack. A forklift
will be needed to unload brackets.
Figure 22
Engage/Disengage Levers
23049
Figure 23
Bin Rack