Chains, Gearbox levers, Walkboard – Great Plains ADC2220 Predelivery Manual User Manual
Page 27
Advertising
3/3/2006
167-088Q-RUS
25
Cart Assembly
23496
Figure 48
Chain Routing
Chains
Refer to Figure 48
1.
Unwrap and route chain from front gearbox
to front meterbox as shown in Figure 48.
NOTE: Chain will wrap the same from rear
gearbox to rear meterbox.
Gearbox Levers
Refer to Figure 49
1.
Slide gearbox levers (3) through holes in
mounting plate (2).
2.
Attach levers (3) to gearboxes as shown.
Secure with cotter pin (1).
Walkboard
Refer to Figure 50
1.
Attach walkboard handrail to rear bin using
bolts (2) and flat washers (3).
2.
Secure handrail using flat washers (4) and
lock nuts (5).
3.
Attach other walkboard handrail to rear of
front bin using steps 1 and 2 above.
23497
Figure 49
GearboxLevers
Figure 50
Handrail Assembly
23443
Advertising