Caution – Great Plains ADC2220 Predelivery Manual User Manual
Page 43

3/3/2006
167-088Q-RUS
41
Implement Assembly
Refer to Figure 94
4.
Carefully lower wing frame onto blocks or
stands. Remove lift straps. Replace straps
so frame can be lifted in position.
5.
Align right wing frame and center section
frame.
Figure 94
Righting Frame
24146
Figure 93
Right Wing Frame
24145
Refer to Figure 92
3.
Secure coulter arm in position with bolt and
nut.
Frame
Refer to Figure 93
1.
Attach lift straps to the right wing frame in
the rack.
!
CAUTION!
Obey all safety instructions from lifting equipment
manufacturer. Be sure lift straps are securely at-
tached prior to lifting. Be sure lifting equipment has
enough capacity to lift implement.
2.
Unscrew and remove all bolts securing right
wing frame to rack.
3.
Using a forklift or other implement, remove
right wing frame from rack.
24149
Figure 92
Secure Arm