Meterboxes – Great Plains ADC2220 Predelivery Manual User Manual
Page 23

3/3/2006
167-088Q-RUS
21
Cart Assembly
23048
Figure 36
Align Rear Bin to Frame
23061
Figure 37
Bag of Hardware
Refer to Figure 36
21. Align holes in bottom of bin with holes in frame
so bin can secure to frame with bolts.
Refer to Figure 37
22. Secure bin to air drill cart frame using hard-
ware located in bags attached to the frame.
Meterboxes
Refer to Figure 38
1.
Place a thin bead of silicon around the top
edge of one meterbox (1). Attach meterbox (1)
to front bin with flared outlets toward the back.
2.
Use vise grips to hold meterbox (1) to bin. Se-
cure box (1) to bin using bolts (4), washers (2),
and nuts (3).
3.
Repeat steps 1-2 to attach second meterbox
to rear bin.
Front Bin
Rear Bin
Figure 38
Meter Boxes
23460
NOTE: ADC2220 frame is removed for clarity.