Great Plains ADC2220 Predelivery Manual User Manual

Page 28

Advertising
background image

167-088Q-RUS

3/3/2006

ADC2220 & NTA 3510

26

Refer to Figure 51

4.

Attach upper ladder mount (2) to
bins using bolts (10), flat wash-
ers (4), lock washers (5), and
hex nuts (6).

5.

Place upper ladder weldment (3)
on mount (2). Secure weldment
(3) to mount (2) and handrails (1)
using bolts (7), lock washers (9)
and hex nuts (8).

Refer to Figure 52

6.

Attach walkboard (1) to upper
ladder mount (2).

7.

Secure walkboard (1) to mount
(2) with bolts (4), 3-point step
retainers (3), lock washers (5),
and hex nuts (6).

23068

23498

Figure 51

Upper Ladder Mount and Weldment

Figure 52

Walkboard

NOTE: Front bin removed for clarity.

Advertising