Great Plains ADC2220 Predelivery Manual User Manual
Page 28
Advertising
167-088Q-RUS
3/3/2006
ADC2220 & NTA 3510
26
Refer to Figure 51
4.
Attach upper ladder mount (2) to
bins using bolts (10), flat wash-
ers (4), lock washers (5), and
hex nuts (6).
5.
Place upper ladder weldment (3)
on mount (2). Secure weldment
(3) to mount (2) and handrails (1)
using bolts (7), lock washers (9)
and hex nuts (8).
Refer to Figure 52
6.
Attach walkboard (1) to upper
ladder mount (2).
7.
Secure walkboard (1) to mount
(2) with bolts (4), 3-point step
retainers (3), lock washers (5),
and hex nuts (6).
23068
23498
Figure 51
Upper Ladder Mount and Weldment
Figure 52
Walkboard
NOTE: Front bin removed for clarity.
Advertising