Air-Pro

®

Meter Operation

Refer to Figure 26

The meter disk is driven, top forward, by a chain drive
(not shown) always connected to the section drive shaft.
At non-planting rows, use a blank disk (page 59).

Seed is air-delivered to the inlet above the air release
screen

. Seed customarily fills to the top of the screen,

blocking further air flow from the seed delivery system,
until the seed level falls below the screen.

Seed enters the meter at the seed inlet shutter

(if

open), and forms a seed pool

at the base of the meter.

Seed pool size is controlled by the shutter handle
setting (which is the only user adjustment at the meter).
Initial shutter settings are given in the seed rate charts.

Meter pressurization air enters the meter at

, and exits

the meter primarily at the seed pockets in the seed disk.
The pressure differential holds seed in the disk
pockets

rising from the seed pool. Excess seed at a

pocket is picked off by the tickler brushes

.

The strip and drop brushes block meter pressurization
air. Seeds passing the drop brush

are free to fall into

the seed tube, and are detected by the seed sensor

.

Meter Operation

1.

Install disks for your crop/population range per the
Seed and Fertilizer Rate manual and the instructions
beginning on page 57 of this manual.

2.

Open the shutter at planting rows to the
recommended initial setting (from the Seed Rate
charts). At unused rows, install a blank disk
(page 59) and close shutter.

3.

Set sprocket indexing if staggering a twin-row crop
(see Seed and Fertilizer Rate manual for details).

4.

Operate fan to achieve suggested manifold pressure
(Seed and Fertilizer Rate manual, and page 43).

5.

Open slide gates to fill meters (page 24).

6.

With all rows primed, rotate meters one turn to fill
pockets to edge of drop brush. Rotate the drive shaft
(top forward) with a

7

8

inch (23 mm) wrench, or raise

and rotate ground drive wheel (top forward).

7.

Leave fan running (to keep seed in top pockets).
Re-install rain covers. Commence planting.
Meter operation is automatic from this point on.

See also:
Seed Pool Troubleshooting” on page 65,
Meter Clean-Out” on page 76, and
Meter Brush Maintenance” on page 77.

Figure 26

Air-Pro

®

Seed Meter at Row

29825

3

2

1

5

6

4

7

8

9

1

2

3

4

5

6

7

8

9

Advertising
This manual is related to the following products: