Seed loading close-out – Great Plains YP1625A Operator Manual User Manual

Page 37

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

33

2013-08-13

Table of Contents

Index

401-625M

E. Load seed. Shutoff cab circuit, then auger. Return

Aux valve control handle to “Marker” position.

F.

Disconnect auger hydraulic hoses at Aux ports.

Refer to Figure 42 and Figure 43
21. Load seed. Cross-check the expected amount

against the indicator marks molded into the side of
the hopper. The figures at right show the
approximate capacity by fill depth.

22. Connect optional hopper level sensor to monitor

harness.

For planters equipped with optional 82 bu. or 150 bu.
hoppers, an extra level sensor is included. Use
Figure 42 or Figure 43, showing capacity, to place it
at the level that suits your operation. The hopper
sensor is in addition to the air box manifold level
sensor.

23. Close and latch lid(s).

Seed Loading Close-Out
24. If at the planting field, open the slide gate.

Figure 41

Marker/Aux Valve Set to Aux.

28492

Figure 42

82 bu. Bulk Hopper

22958

Approximate capacity of 82 bu./2890 liter
hopper, at 10in/25.4cm increments

bu

liters

82

2890

69

2400

47

1660

26

920

10

350

1.75 60

Figure 43

150 bu. Bulk Hopper

22958

Approximate capacity of 150 bu./5290 liter
hopper, at 10in/25.4cm increments

bu

liters

150 5290

132 4650

94

3310

55

1940

22

780

6

210

0.7 20

Advertising
This manual is related to the following products: