Seed loading close-out – Great Plains YP1625A Operator Manual User Manual
Page 37
Great Plains Manufacturing, Inc.
Operating Instructions
33
2013-08-13
401-625M
E. Load seed. Shutoff cab circuit, then auger. Return
Aux valve control handle to “Marker” position.
F.
Disconnect auger hydraulic hoses at Aux ports.
Refer to Figure 42 and Figure 43
21. Load seed. Cross-check the expected amount
against the indicator marks molded into the side of
the hopper. The figures at right show the
approximate capacity by fill depth.
22. Connect optional hopper level sensor to monitor
harness.
For planters equipped with optional 82 bu. or 150 bu.
hoppers, an extra level sensor is included. Use
Figure 42 or Figure 43, showing capacity, to place it
at the level that suits your operation. The hopper
sensor is in addition to the air box manifold level
sensor.
23. Close and latch lid(s).
Seed Loading Close-Out
24. If at the planting field, open the slide gate.
Figure 41
Marker/Aux Valve Set to Aux.
28492
Figure 42
82 bu. Bulk Hopper
22958
Approximate capacity of 82 bu./2890 liter
hopper, at 10in/25.4cm increments
bu
liters
82
2890
69
2400
47
1660
26
920
10
350
1.75 60
Figure 43
150 bu. Bulk Hopper
22958
Approximate capacity of 150 bu./5290 liter
hopper, at 10in/25.4cm increments
bu
liters
150 5290
132 4650
94
3310
55
1940
22
780
6
210
0.7 20