Field setup checklist – Great Plains YP1625A Operator Manual User Manual

Page 40

Advertising
background image

36

YP1125A & YP1625A

Table of Contents

Index

Great Plains Manufacturing, Inc.

401-625M

Table of Contents

Index

2013-08-13

Field Setup Checklist

Use the following checklist as a guide to ensure the
planter is properly setup before using.

To complete checklists, you may need to refer to the:
SRM: Seed Rate Manual (SRM),
PDC: DICKEY-john

®

Planter/Drill Control manuals, or

QSG: DICKEY-john

®

Quick Start Guide

ELECTRICAL

Page

All connections made

17

Check all lights

Power up monitor. Watch for diagnostics.

PDC

Verify Material, Rate and “SPLIT AIR”
Channel setup. Verify Channel setup for
hydraulic drive (Option).

QSG

PDC

HYDRAULIC

Page

Tractor reservoir full

Marker/Aux valve to Marker (Option)

44

All hydraulic circuits connected

15

Fan direction and rpm

42

Hydraulic drive connection

a

(Option)

a. Perform a “FILL DISK” operation via the seed monitor.

39

Raise tongue. Lift planter

17

Begin unfold

20

Re-phase fold system

21

Lower tongue

21

Unfold wings. Check for tongue lock.

22

Re-phase lift cylinders

25

Check marker operation

44

Inspect for hydraulic leaks

3

MECHANICAL

Page

Tongue height preset on 3-point

17

Set tractor 3-point hitch to “depth control”
operation (and not load control)

45

Side to side levelness at gauge wheels

147

Toe-in of wing frames at pull-bars

148

Tongue hook latch operation

22

Marker extension and disk angle set

150

AIR SYSTEM

Page

Manifold to PROBOX

®

or poly hopper seal.

30

Y-splitters turned off for unused rows.

71

Blank disks installed at unused rows.

72

Air leaks (small leaks from PROBOX

®

are

normal).

84

Hose routings, no sags and no pinched
hoses. (Check folded and field positions.)

Hoses fully connected to meters and
locked.

Start fan. Turn on seed monitor active air
control. Watch for split air vane movement
or air pressure changes.

42

PDC

Activate the “FILL METER” function of the
monitor. Watch for air vane movement, or
watch meter pressurization go to zero.

PDC

On a new planter, pre-lubricate the air
system with Ezee Glide Plus.

30

Set the meter pressurization target to the
recommended value for the crop.

PDC

ROW CLEANERS

Page

Check for correct installation of row
cleaners on all rows if equipped.

Check that row cleaners do not catch on
hydraulic hoses.

Carefully watch when folding and unfolding
planter the first time to ensure clearance of
row cleaners.

FERTILIZER

Page

Set rate drive sprockets for correct rate.
(Note fertilizer rate is population
dependent.)

SRM

Check for correct orifice plates.

SRM

Check unused rows are correctly closed off. SRM

Fill system 1/2 full with water and check for
leaks (run pump if possible).

SRM

Disconnect drive chain if fertilizer is not
used.

SRM

Check all row unit lines are connected and
discharge nozzles or tubes are clear.

SRM

Advertising
This manual is related to the following products: