Field operation, Skip and double checks – Great Plains YP1625A Operator Manual User Manual

Page 49

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

45

2013-08-13

Table of Contents

Index

401-625M

Field Operation

Perform all steps in “Pre-Start Checklist” on page 19
and “Field Setup Checklist” on page 36.

PDC: DICKEY-john

®

Planter/Drill Control manuals

SRM: Seed Rate manual

Note: Use Depth Control mode. If tractor 3-point hitch

control is set for Load Control, hitch movement
may cause changes in row unit depth resulting in
uneven depth control.

First Pass Operation Checklist

Page

1. Set planting rate.

49

2. Unfold marker on next-row side.

44

3. With tractor at high idle, set fan hydraulic

circuit to low flow, engage circuit. Gradually
adjust fan hydraulic flow to obtain
recommended rpm.

42

4. Set or verify meter pressurization value.

SRM

5. Engage optional hydraulic seed drive via

seed monitor.

PDC

6. In the CLUTCH cluster of the CFM, set all

switches, including Master, to ON.

38

7. Pull forward, lower planter, and begin

planting for a short distance.

8. Stop. Assess:

planting depth,
skips or doubles (see sidebar and page 51),
seed spacing (to verify population),
press wheel operation and
fertilizer application (if in use)

9. Continue planting for at least 10 seconds (so

that the seed monitor is reporting a stable
population number). Verify that it is your
desired rate.

10. Make necessary adjustments

48

Figure 54

CFM: Planting Configuration

28491

Skip and Double Checks
A. Dig up seed (or plant shallow with press wheel tied

up). Check seed spacing against charts.

B. With meters still charged with air, carefully inspect

disks at several rows.

Inspect the arc from just after the top tuft brush to
the bottom edge of the seed drop brush. Look for
cells (seed pockets) having no seed, or more than
one seed. You may need a flashlight to perform this
inspection.

Sharp Field Turns Checklist

Page

1. Fold marker

44

2. Raise planter

24

3. Make turn

4. Lower planter

24

5. Unfold marker on next-row side.

44

6. Resume planting.

Suspending Planting Checklist

Page

1. Stop tractor

2. Fan hydraulic circuit to Float or Neutral

42

3. Fold Marker

44

4. Raise planter

24

Ending Planting Checklist

Page

1. Suspend operations as above, then

2. Fold planter

25

3. Install transport locks

26

4. Lights ON

-

5. Transport

28

Advertising
This manual is related to the following products: