4.

PROVING phase

The proving phase is the fourth phase of the automatic cycle.

The temperature regulation is active and is NEUTRAL AREA, the work set-point is established by the final user. The

passage from the recovery set-point (previous phase) to the proving set-point can be gradual with increase percentages

established in the parameters programming phase.

The relative humidity regulation is active and is NEUTRAL AREA, the work set-point is established by the final user.

The duration in hours and minutes of the phase and the evaporator fan speed are established by the final user.

5.

BAKING DELAY phase

The baking delay phase is the fifth phase of the automatic cycle.

The baking delay phase is always disabled but can be enabled both in the cycle setting phase and also with cycle in

progress by the final user.

The temperature regulation is active and is NEUTRAL AREA, the work set-point is established by the final user.

The relative humidity regulation is active and is NEUTRAL AREA, the work set-point is established by the final user, as is

the evaporator fan speed.

The duration of the phase is theoretically infinite, i.e. it ends when the cycle is interrupted by pressing the stop key for 3

seconds.

There are also 2 manual work cycles available; one MANUAL REFRIGERATION cycle (equivalent to a storage but with

infinite duration) and a MANUAL HEATING cycle (equivalent to a proving cycle with infinite duration and without regulation

steps).

To make these regulations possible, the controller will therefore manage the utilities set-up for cooling (compressor,

evaporator fan, defrosting, pump-down electrovalve), for heating (heating elements or operating in heat pump mode),

humidification (steam generator, humidifier) end dehumidification (dehumidification via extraction fan or via activation of

the cooling plant); the regulations of each individual utility will be described in the following chapters.

In addition to management of the automatic and manual cycles, the controller envisions the possibility to manage other

functions, such as:

-

Pre-cooling management

-

"Delayed baking" connection/disconnection management

-

Cabinet light management

-

Management of 10 user programs

-

Management of 10 Favourite Programs

-

Connection to RICS

-

Host USB port management on machine for: download/upload PROGRAMS, download/upload PARAMETERS and

download HACCP data.