1 electric connections (default configuration) – EVCO EPH4DXP1SA User Manual

Page 15

Advertising
background image

EVCO S.p.A.

c-pro 3

hecto MCSA | User manual ver. 2.0 | Code 144MCSAE204

page 15 of 52

2.3.1

Electric connections (default configuration)

Hereinafter the default I/O configuration for the three pre-set kind of machine. They can be modified by operating on

the dedicated parameter (PGUT) or on the dedicated parameters (manufacturer menu); see the dedicated paragraph.

PGUT = 1

-

zone 1 (temperature and humidity)

-

zone 2 (temperature)

-

Vroom.

I/O

Description

Zone controller

Analogue inputs

AI 1

External Temperature (NTC)

AI 2

Supply Temperature ( NTC)

AI 3

Zone 2 temperature (NTC)

Serial ports

RS 485

Modbus RTU protocol

CANbus

To the V-room (N.B. with V-room receive temp. probe °C and RH% signals via bus)

V-room temperature probe (zone 1)

V-room humidity probe (unique)

Digital inputs (potential-free contact ON-OFF)

DI 1

Mixing circuit flow switch

DI 2

Hot block alarm boiler

DI 3

Alarm – cooling block Chiller

DI 4

Remote summer winter

DI 5

Dehumidifiers alarm

Analogue outputs (PWM/0-10V/4-20mA)

AO 1

not available

AO 2

0-10 V flow modulating valve (or 4-20 mA to be ordered)

AO 3

Heating booster control (winter) or for cooling (summer)

Digital Outputs (Relay)

DO 1

collector_zone 1

DO 2

collector_zone 2

DO 3

Dehumidifier collector/dehumidifier consent

DO 4

Hot consent (Boiler or HP)

DO 5

Cold consent (Chiller)

DO 6

Apartment flow line circulation pump control

Advertising
This manual is related to the following products: