YSI 6200 User Manual

Page 13

Advertising
background image

YSI 6200 DAS USER Manual

YSI/Massachusetts 508.748.0366, Fax 508.748.2543

Page 2-4

Assuming that all shipping cartons have been opened and the equipment has been initially
checked for damage, proceed by doing the following.


1.

Place the 6200 Data Collection Platform enclosure on a work surface, leaving space for

accessories to be laid out and connected. Position the enclosure so that the bottom (connector
ports) faces toward you. Next open the hinged cover, by releasing the two latches on the right
side. Refer to the diagram below, and remember that the diagram may differ slightly from your
unit based on the components you ordered.

Met Suite

Rain Gauge

Pyranometer

Antenna or RF cable port

Barometer Vent

Conduit Fittings for AC,
solar, and phone lines

6-Series Sonde

bottom view of enclosure

Front Cover

Grounding Terminal

AC Power In

Radio or
Cell Modem

Phone Modem

Battery

Digital I/O

Analog Inputs

Phone

Solar Power In

Fuse

COM Port

Desiccant Pack

Barometer


Figure 2.2 6200 Data Collection Platform, Component and Connector Layout


2.

If a radio is installed in the 6200 DCP enclosure, you should locate the field antenna that you

ordered and connect it to the antenna connector on the bottom of the enclosure.

CAUTION!

To avoid permanent damage to the radio transceiver, connect the antenna before

powering the 6200 DCP or the radio base unit.

Advertising