YSI 6200 User Manual

Page 45

Advertising
background image

YSI 6200 DAS USER Manual

YSI Massachusetts 508.748.0366, Fax 508.748.2543 Page 4-8

Battery

Digital I/O

Analog Inputs

Phone

Solar Power In

COM Port

Desiccant Pack

+

-

To Solar Panel

Feed-through Gland

Solar Power Cable
2-conductor

Figure 4.5 Solar Power Supply Connections

Once you have installed solar power to the 6200 DCP, connect the battery leads as described in
Section 4.3. The field station should beep for about 5 seconds during boot up. Your system is now
solar power-connected for continuous charging of the battery when environmental light is present.
If the solar panel fails for any reason, the battery will provide power for a few days or weeks,
depending on the state of the charge when solar power failed, the number of sensors and the
frequency of data logging.

Advertising