Management of non-critical loads (cdp-g model) – CIRCUTOR CDP-0 User Manual

Page 19

Advertising
background image

CDP

Instruction Manual

19

Figure 14: Deactivating the alarm on the web site.

4.1.3. MANAGEMENT OF NON-CRITICAL LOADS (CDP-G Model)

This functionality allows you to add non-critical loads depending on if more
power can be obtained from the inverter. This management can be manual or
dynamic and is carried out through the use of the system's auxiliary relays
(Terminals 11 to 16 of

Table 2

).


Manual management
is performed from the configuration web site, from which
you can view and modify the status of the relays (

Figure 15

).


Figure 15: Manual management of non-critical loads from the web site.


When managing dynamic control, the loads are connected based on having
met two conditions:

1.-

Setpoint value

Maximum modulation value.

𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃

𝑃𝑃𝑃𝑃𝑚𝑃𝑚𝑚 𝑚𝑃𝑖𝑃𝑖𝑖𝑃𝑖 𝑥 100 ≤ 𝑀𝑚𝑥. 𝑃𝑃𝑃𝑃𝑚𝑚𝑖𝑚𝑃𝑃 𝑖𝑚𝑚𝑃𝑃

Equation 1: Condition 1 for load connection.


Where the Maximum modulation value is the ratio between the power
consumed by the user and the maximum power that can be obtained by the
configured inverters. In other words, the maximum modulation value (%) is:

Advertising
This manual is related to the following products: