Figure 27: Single-phase installation with 3 loads to connect (Load 1 Connected).

In this situation the CDP-G maintains the system without adding or removing any
loads for a time equalling the longer of the configured “Reconnection time” and
Min. disconnection time” variables, in order to achieve system stability (in this
case 5 minutes).

To check if this load must be disconnected, the CDP-G waits for the amount of
time programmed in the “Min. connection time” variable and then checks if the
following condition is met:

Disconnection condition:

𝑷𝑷𝑷𝑷𝑷

∑ 𝑷𝑷𝑷𝑷𝑷𝑷𝑷𝑷𝑷𝑷 𝑷𝑷𝒓𝒓𝒓𝒓 < 𝑀𝒓𝒂. 𝑷𝑷𝑷𝑷 𝑷𝑷𝑷𝑷𝑷𝑷𝒐𝒐𝑷𝑷𝑷𝑷


(

0

6000

= 0%)  0% ≤ 50% 

this condition is met

relay 1 stays connected


Then, the CDP-G will check whether it can connect the next load. To do so, it
must verify whether the 2 connection conditions are met:

Condition 1:

𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃

𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃 𝑃𝑃𝑖𝑃𝑖𝑖𝑃𝑖

𝑥 100 ≤ 𝑀𝑚𝑥. 𝑃𝑃𝑃𝑃𝑚𝑚𝑖𝑚𝑃𝑃 𝑖𝑚𝑚𝑃𝑃


(

6000

10000

𝑥 100 = 60%)  60% ≤ 90%  this condition is met