Cable column – Cybex 55620H Modular User Manual
Page 147

CABLE COLUMN
5633
ASSEMBLY & PARTS
Assembly Notes
1. Keep all shipping packages near area of
installation. Standard items include:
• Shipping box for Column - 5605-9x
• Handrail - 5315-50
• Top Weight Package - 01475
• Weight Pack 1 (3 x 12, black) - 4700S110
• Upper Boom - 5315K002
• Lower Boom - 5315K003
NOTE: x denotes specific color.
2. Follow assembly guidelines listed on the
5600 Modular Center Post Assembly & Parts
instruction sheet. Also refer to the steps
listed below.
NOTE: Refer to the exploded-view assembly
diagram when performing steps listed below.
3. Lay column on side.
4. Install lower pulley bracket (item 12). Install
upper pivot tube (item 17) and upper pulley
mount (item 11).
5. Lift column into upright position and secure
to center post.
6. Install Upper Boom. See Upper Boom
Installation Instructions supplied with the
Upper Boom kit.
7. Set chrome tube into hand rail assembly.
Fasten upper portion finger tight
8. Install Lower Boom if applicable. See Lower
Boom instructions supplied with Lower Boom
kit.
9. Attach lower portion of hand rail to column.
10. Route cable. NOTE: Be sure to insert cable
through brass bushing. See Cable Routing
Detail.
11. Install weight stack.
12. Mount column to Modular configuration.