Installation - Direct Expansion (DX) Coil Piping (Optional)

Installation

IMPORTANT!

Guidelines for the installation of direct expansion cooling coils have been provided to insure proper

performance and longevity of the coils. These are general guidelines that may have to be tailored to

meet the specific requirements of any one job. As always, a qualified party or individual should

perform the installation and maintenance of any coil. Protective equipment such as safety glasses,

steel toe boots and gloves are recommended during the installation and maintenance of the coil.

IMPORTANT!

All field brazing and welding should be

performed using high quality materials and an

inert gas purge (such as nitrogen) to reduce

oxidation of the internal surface of the coil.

IMPORTANT!

All field piping must be self supporting and

flexible enough to allow for the thermal

expansion of the coil.

Hot Gas Bypass

(by others)

Step 1 Locate the Distributor(s) by Removing the Distributor Access Panel

(by others)

Installation with Hot Gas Bypass

Step 2 Verify Nozzle Placement

Inspect the refrigerant distributor and verify that the
nozzle is in place. The nozzle is generally held in
place by a retaining ring or is an integral part of the
distributor itself.

Retainer
Ring

Nozzle

Distributor

NOTE!

If a hot gas bypass kit was provided by others,

refer to the manufacturer’s instructions

Nozzle Placement

Step 3 Install Suction Line

Install suction line(s) from the compressor to the suction connection(s) which are stubbed through the side of
the cabinet.

Distributor Access Panel