Hypertherm Shape Cutting Control User Manual

Page 53

Advertising
background image

Voyager III

47

New Setups May Require Restarting SERCOS Ring to Take Effect. Restart
SERCOS Ring?
When changes are made to system configuration that affect the SERCOS ring
operation, you may be prompted to restart the ring. Restart of the ring is
recommended.

SERCOS Drives Not Enabled and Ready. Please Check Drive are Enabled
and Ready with No Errors.
This status message indicates the SERCOS ring is not running due to a missing
enable signal. First check that the Control Enable Disabled softkey is correct.
The softkey should read DISABLE CONTROL. Then check status of ring
hardware or external drives to ensure there are no errors displayed.

Machine Interface

I/O Configuration Type “V” ( Positive Logic Single Ended I/O )
Connecting single ended I/O to the control. The control provides +24V power on
pins 22, 23 & 24 (+24 VDC) and pins 9, 10, 11 &12 (24 VDC Common) on the I/O
connector.


Output tied to external Cut On

Input tied to Cut Sense Relay











Advertising