Receiving and unpacking – Nortec MH Series User Manual

Page 5

Advertising
background image

Introduction | 2

Receiving and Unpacking

1 Check packing slip to ensure ALL material has been delivered.
2 All material shortages are to be reported to Nortec within 48 hours from receipt of goods.

Nortec assumes no responsibility for any material shortages beyond this period.

3 Inspect shipment for damage and note damages on shipping waybill accordingly.
4 After unpacking, inspect equipment for damage and if damage is found, notify the shipper

promptly.

5 All Nortec products are shipped on an FOB factory basis. Any and all damage, breakage or

loss claims are to be made directly to the shipping company.

Before Installation

1 Ensure that available voltage and phase corresponds with humidifier voltage and phase as

indicated on humidifier’s specification label.

2 Ensure sufficient clearances will be available for P-Trap on drain pan overflow and for proper

slope of drain line from hydraulic unit.

3 Ensure sufficient clearances will be available as described in Location on page 13.

4 Ensure duct access will be available from downstream of duct manifold to install, maintain,

and replace media boxes.

5 Report any discrepancy immediately to the site engineer.

Figure 1: Specification Label Location

Note:
Each MH is shipped in multiple packages containing; 1) Control Box, 2) Hydraulic Unit,

3) Drain pan and duct manifold sheet metal, 4) Media Boxes, 5) Mist Eliminator

(if ordered).

Advertising