Installing the hardware, Verifying your shipment – Enterasys Networks 8000/8600 User Manual

Page 67

Advertising
background image

Enterasys X-Pedition 8000/8600 Getting Started Guide

55

Installing the Hardware

Installing the Hardware

This section describes how to perform the following tasks:

•

Check the shipping box to ensure that all the parts arrived

•

Install the chassis (on a tabletop or in an equipment rack)

•

Install the control module

•

Install a memory upgrade

•

Install the switching fabric module (X-Pedition 8600 only)

•

Install line cards

•

Install the power supply (either AC or DC)

•

Attach console management cables

•

Attach port cables

Verifying Your Shipment

Before you begin installing your X-Pedition, check your shipment to ensure that everything you
ordered arrived securely.

Caution

: To avoid back strain, be careful when lifting the chassis out of the shipping box.

Open the shipping box(es) and verify that you received the following equipment:

•

An X-Pedition 8000 or X-Pedition 8600 chassis containing a backplane, fan module, and a
console cable. The console cable is used for connecting a terminal to the control module DB-9
port.

•

An X-Pedition 8000 or X-Pedition 8600 power supply.

•

One country-specific power cable per power supply.

•

One control module.

•

One Switching Fabric Module (X-Pedition 8600 only).

•

An X-Pedition Media Kit containing:

–

One PCMCIA flash card containing the X-Pedition system software

–

One copy of the Enterasys X-Pedition 8000/8600 Getting Started Guide (the book you are
reading now)

–

Release Notes

Advertising