Caution, 7100fp epa woodburning fireplace, E. timer assembly replacement – Hearth and Home Technologies EPA Certified Woodburning Fireplace 7100FP-GD-B User Manual

Page 36

Advertising
background image

Page 36

433-1390G

September 1, 2008

R

7100FP EPA Woodburning Fireplace

Remove 2 screws and
pry open access door.

1. Remove both doors, fascia and brick.

2. Remove 2 Phillips head screws and pry open access

door in the bottom of the fireplace with a flat head screw-
driver. Figure 36.1.

E. Timer Assembly Replacement

3. Remove 2 screws and take off access cover. Figure

36.2.

NOTE: The timer assembly included in this kit comes
with the air chamber cover attached.
Figure 36.3.

Figure 36.1 Open Access Door

Figure 36.2 Access Cover

Remove 2
screws

Air Chamber Cover is
attached to Timer Assembly

8/32 Screw installed back to
front and secured with a
lock nut

Figure 36.3 Timer Assembly with Air Chamber Cover

(Linkage arm is not included in the kit)

Figure 36.4

Figure 36.5

Move arm left

Be careful not to
drop Linkage Arm
down into fireplace

5. Remove 2 screws from timer linkage upper arm. Be

careful NOT TO DROP arm in bottom of fireplace. Figure
36.6.

Figure 36.6

4. You will need to disconnect air chamber cover from timer

assembly before installing in the fireplace. Set screws
aside for later use. Figure 36.4.

Shock Risk

Disconnect power by turning off circuit breaker
BEFORE servicing.

CAUTION

6.

Remove 2 screws from timer mounting plate. Figure
37.1.

Advertising