7100fp epa woodburning fireplace, F. manual timer override – Hearth and Home Technologies EPA Certified Woodburning Fireplace 7100FP-GD-B User Manual

Page 37

Advertising
background image

September 1, 2008

433-1390G

Page 37

7100FP EPA Woodburning Fireplace

R

Timer Plate

Rotate assembly up and
out through access door

Arm must be in this position
when re-installing

Figure 37.1

Figure 37.2

Figure 37.3

8.

Remove old air chamber cover. Place the cover under
the bottom of the firebox. Using a 7/16 wrench attach the
(2) 1/4-20 bolts as shown in Figure 37.4.

Firebox Bottom

Air Chamber Cover

Attach with 1/4-20 bolts

Figure 37.4

Figure 37.5

7. Place your hand into the access door in the floor of the

fireplace. Let the timer assembly and plate drop down
and rotate it up through the access door. You will be
looking at the back side of the assembly. Figures 37.2 &
37.3.

9.

Insert the new timer assembly into the access door with
the back side towards you. Please note the correct posi-
tion of the linkage lower arm in Figure 37.3.

10. After re-installing the timer assembly through the fire-

box access door, re-attach the timer assembly to the
air chamber cover using a Phillips head screw driver.
Figure 37.5.

11. Attach the linkage upper arm to the lower linkage arm.

Figure 36.6 on page 36.

F. Manual Timer Override

If timer is unintentionally engaged, push the Timer Override
Lever to the left. This will disengage the timer and set the
fireplace back to the low setting. Figure 37.6.

Timer Override Lever

Figure 37.6

Advertising