SENA ProBee-ZE10 User Manual

Page 55

Advertising
background image

55

ProBee-ZE10 User Guide Rev.1.5

6.5

Configuration Example #2: 1 Coordinator and 2 End-Devices

Here is another example assuming different system configurations. This example can be described as

follows:

One ZE10 module acts as a coordinator and it is connected to a host computer via serial cable.

Two ZE10 modules act as end-devices.

Turn on/off the LEDs of the end-devices remotely through the coordinator

Figure 6-4 Example #2: 1 Coordinator and 2 End-Devices

6.5.1

Coordinator Configuration

Hardware configuration for the coordinator is as follows:

Set the HOST switch to UART

Connect a serial cable between a host computer and the coordinator

The AT commands for coordinator configuration is as follows:

AT+NODETYPE=1

OK

AT+PANID=7772

OK

ATZ

OK

6.5.2

End-devices Configuration

Hardware configuration for the coordinator is as follows:

Set the GPIO_OUT switch to LED_ON

The AT commands for the end-devices are as follows:

Advertising