GE Industrial Solutions 6KCV300WPD User Manual

Page 18

Advertising
background image

GEL100340

D e b u g g i n g

To

Debug

Simulate several cycles

Stop the simulation

I

Unload the model

Unload DLL

Set probe on signal.

Probe

Create a monitor

Create a trace

Remove a probe

Remove all probes

create

Create

Probe

Remove
Probes

Shortcut

Comments

See paragraph

F8

the model into memory and

initializes it.

9.5

The model is simulated once on the PC

9.5

The model is simulated several times.

9.5

The number of cycles is determined by a

The model is unloaded and the data is

9.5

removed from the monitors
The model is removed from memory.

9.5

A probe is set on the selected signal

9.1

(connection line)
After selecting this menu item a signal is 9.1.1
selected which is monitored.
After selecting this menu item a signal is 9.1.1

selected to trace a signal.

selecting this menu item a probe is 9.2

selected which will be removed.
All probes within the project are
removed.

9.2

3 . 1 . 7 T o o l s

Generate a cross

3 . 1 . 8 O p t i o n s

Set the PC as the target

Simulation

Set the microcontroller

Target
Execution

I

system

I

I

Set the settings of the
schematic
Set general settings
Set the colors

Settings..

settings..

Setting the external tools

Code will be generated for the target

8.4

system

‘A dialog is opened for setting options of 10.1

the schemes
A dialog is opened for general settings.

10.2

A dialog is opened for setting the colors

10.3

within the schematics.

A dialog is opened that where external

10.4

tools that extend the tools menu are
defined

Advertising