1) operation description – Yokogawa GC8000 Process Gas Chromatograph User Manual

Page 66

Advertising
background image

<1. Overview>

1-39

IM 11B08A01-01E

Run

Pause

Stop

Run

Pause

Stop

Run

Stop

Stream sequence

Stream designation

Calibration/validation

*1

*1

*1

*1

*1

*2

*1

(1)

(2)

(1)

(2)

*1

(3)

(4)

(A)

(A)

(A)

(A)

(B)

(B)

(B)

(B)

*1:

Command can be canceled.

*2:

Only for manual

• If a calibration/validation command is issued during the pause mode or the stop mode in the stream sequence or stream specifi ation

(N times or continuous (set to “0”)) status

(A) The measurement status and the operation mode innediately changes to the requested calibration/validation status and the

run mode, respectively.

(B) The measurement status and the operation mode respectivily return to the stream sequenace status and the stop mode

when calibration/validation is complete for all the spwcifi ed streams.

• If a calibration/validation command is issued during the run mode in the stream sequence status

(1) The measurement status changes to the requested calibration/validation status when the measurement of the currently-

measured stream is completed.

(2) The measurement status and the operation mode respectively return to the stream sequence status and the run mode when

calibration/validation is completed for all the specifi ed streams. The suspended measurement is (not reset but) resumed from
the next stream.

• If a calibration/validation commands is issued during the run mode in the stream specifi cation (N times) status

(3) The measurement status changes to the requested calibration/validation status when the Nth round of the spwcifi ed

measurement is completes.

(4) The measurement status and the operation mode respectively return to the stream specifi cation (N times) status and the stop

mode when calibration/validation is completed for all the specifi ed streams.

• If a calibration/validation command is issued in the stream specifi cation (Continuous (set to “0”))status

(3) The measurement status changes to the requested calibration/validation status when the measurement of the currently-

measured stream is completed.

(4) The measurement status and the operation mode respectively return to the stream specifi cation (Continuous) status and the

run mode when calibration/validation is completed for all the specifi ed streams.

Figure 1.19

Transition among measurement statuses and operation modes

(1) Operation description

For example, this section describes the operation where the stream sequence, calibration, and
validation are set as shown in Table 1.5, 1.6, and 1.7, respectively.

Table 1.5

1st stream

2nd stream

3rd stream

Stream sequence 1

Stream 1

Stream 2

Stream 3

Stream sequence 2

Stream 4

Stream 5

Stream 6

Table 1.6

Calibration

stream

Measurement

frequency

Automatic

calibration

Validation

stream

number

before

calibration

Measurement

frequency

Validating

stream

number

after

calibration

Measurement

frequency

Calibration 1 Stream 7

2

Valid

0

0

Stream 8

1

2nd Edition : May 11, 2012-00

1

Advertising