C) automatic calibration – Yokogawa GC8000 Process Gas Chromatograph User Manual

Page 93

Advertising
background image

<1. Overview>

1-66

IM 11B08A01-01E

● In the case where a stop command is received during the run mode in the (semiautomatic)

calibration/validation status [4E2]

The operation mode is immediately prepared to be changed to the stop mode in the

calibration (or validation) status.

The operation mode changes to the stop mode in the previous measurement status when

the current measurement is completed.

Run

W7

W7

W8

S7

S7

Time

Stream sequence 1

Calibration 1

Stream sequence 1

Assinning calibration 1

Stop

Stop

[4E2]

Stop command

● In the case where a forced stop command is received during the run mode in the (manual)

calibration/validation status [4F2]

The operation mode is immediately changed to the stop mode in the previous measurement

status.

● In the case where a forced stop command is received when the operation mode is prepared

to be changed from the run mode to the stop mode in the (manual) calibration/validation
status [4F3]

The operation mode is immediately changed to the stop mode in the previous measurement

status.

Stop

Stop

Run

(Waiting for stop)

W7

W7

S7

S7

Time

Stream sequence 1

Calibration 1

Stream sequence 1

Forced stop command

Assinning calibration 1

[4F2] [4F3]

(Stop command)

[4F3]

(c) Automatic calibration

• Stream valves are automatically switched to fl ow the standard sample, then calibration (or

validation) starts automatically at a preset date, time, and interval. The preset calibration (or
validation) patterns of which automatic execution is enabled are automatically executed.

• To select the calibration (or validation) method, touch the “Calibration (validation) method”

button to open the selection window on the GCM operation status screen on the GC-HMI
analyzer operation display (Figure 1.31).

To issue a command to start/stop automatic calibration, touch the “Automatic calibration

start/stop” button to open the confi rmation window on the GCM operation status screen on
the GC-HMI analyzer operation display (Figure 1.32).

On the “Calibration/validation setting” screen on the EtherLCD (Figure 1.33), a set of stream

numbers and the numbers of times of measurement is specifi ed for each of Calibration 1
to 6 and Validation 1 to 6, while the date, time, and interval of automatic start as well as the
validity of automatic calibration are specifi ed.

Users at Level C or higher can cancel the command to change the measurement status

to the specifi ed calibration (or validation) status until the waiting measurement status is
changed to the selected calibration (or validation) number and the measurement of the
currently-measured stream is completed.

2nd Edition : May 11, 2012-00

Advertising