<1. Overview>

1-58

IM 11B08A01-01E

F0127.ai

Figure 1.27

An operation example of the calibration (validation) stop window on the GCM operation

status screen on the GC-HMI analyzer operation display

● In the case where a (manual) calibration/validation command is received during the run

mode in the stream sequence status

The measurement status is immediately prepared to be changed to the calibration (or

validation) status.

The measurement status changes to “Replaceable” in the stop mode in the calibration (or

validation) status when the measurement of the currently-measured stream is completed.

Users at Level C or higher can cancel the calibration/validation command until the operation

mode changes to the stop mode.

Issue a command to start calibration (or validation) after confi rming that manual

replacement of the fl ow with the sample has been completed. When calibration (or
validation) is completed for all the streams specifi ed for the selected calibration (or
validation) number, the operation mode returns to the stop mode in the stream sequence
status.