Preparing the library for operation – HP EML E-series Tape Libraries User Manual
Page 79
Advertising
Figure 58 Repacking the library
2. Corner posts
1. Ramps
4. Cap
3. Corrugated sheets
6. Shock pallet
5. Antistatic bag
Preparing the library for operation
After shipping or moving the library, see the Getting Started manual for your library to:
•
Prepare the new installation site.
•
Receive the library.
•
Uncrate the library.
•
Position the library.
•
Remove the robotics unit shipping restraints.
•
Install and configure the library.
Preparing the library for operation
79
Advertising