Preparing the library for operation – HP EML E-series Tape Libraries User Manual

Page 79

Advertising
background image

Figure 58 Repacking the library

2. Corner posts

1. Ramps

4. Cap

3. Corrugated sheets

6. Shock pallet

5. Antistatic bag

Preparing the library for operation

After shipping or moving the library, see the Getting Started manual for your library to:

Prepare the new installation site.

Receive the library.

Uncrate the library.

Position the library.

Remove the robotics unit shipping restraints.

Install and configure the library.

Preparing the library for operation

79

Advertising