Ag-Bag MB7010HyPac User Manual

Page 66

Advertising
background image

S

ETUP

AND

O

PERATING

P

ROCEDURES

16

Ag-Bag International, Ltd.

MB7010 HyPac November 2003

Section 4

1

2

2

4

5

3

The tunnel extension is stored
on the top of the tunnel. Use
the following procedure to in-
stall the tunnel on your Ag-Bag-
ger

®

. (This procedure is best

accomplished by two people)

a. Attach the bag boom hitch
to the eye located on the cen-
ter of the tunnel extension. Fig
1.

b. Remove the hair pin and
locking pin from the tunnel ex-
tension located on the center
of the extension and the back
of the inoculant applicator
plate. Fig 2. This pin should be
reinstalled any time the Ag-
Bagger is transported.

c. Using the bag boom swing
the tunnel extension out and
lower to a position in front of
the tunnel. Position the exten-
sion where the pins on the ex-
tension (Fig 4.) line up with the
receiver holes (Fig. 3).

d. Use the three pins supplied
with your Ag-Bagger

®

and

place them in the holes indi-
cated by Fig. 5. These pins are
located in the cab of your Ag-
Bagger

®

e. Fold the eye (Fig.1) back
onto the tunnel

T

UNNEL

E

XTENSION

- I

NSTALL

3

Advertising