Ag-Bag MB7010HyPac User Manual

Page 71

Advertising
background image

S

ETUP

AND

O

PERATING

P

ROCEDURES

21

Ag-Bag International, Ltd.

MB7010 HyPac November 2003

Section 4

I

NSTALLING

T

HE

A

G

-B

AG

®

B

AG

(

CONT

.)

10b

10a

9

8

a

b

c

d

5. Remove the anchor from the
transport hook located on the
sweeping tunnel clean-out. Set it
on the ground behind the anchor
support.

6. Using the Anchor In/Out con-
trol on the Arm Rest Counsel
move the cables in until the an-
chor is pulled snugly into the
socket support. Make sure the
Anchor Float switch is in the
OFF position.

7. Using the Tunnel Clean Out
switch on the Arm Rest Con-
sole open and then close the
Sweeping Tunnel Clean Out
making sure the warning light
on the Center Console is work-
ing properly and that the
Sweeping Tunnel Clean Out is
completely closed.

Advertising