Chapter 2 installation and operation, Unpack, inspect, power up, Installation and operation – ADTRAN 4200659L1 User Manual

Page 31

Advertising
background image

61200659L1-1

MX2800 User Manual

2-1

Chapter 2

Installation and Operation

UNPACK, INSPECT, POWER UP

Receiving Inspection

Carefully inspect the MX2800 STS-1 for any damage that might
have occurred in shipment. If damage is suspected, file a claim
immediately with the carrier and contact ADTRAN Technical
Support (
see the front section of this manual for phone numbers).
Keep the original shipping container to use for future shipment or
verification of damage during shipment.

ADTRAN Shipments Include

The following items are included in shipments of the MX2800
STS-1:

MX2800 STS-1 unit

DC or AC power supply (two power supplies come with the
Redundant versions)

Controller card (two cards come with the Redundant versions)

8-pin to 6-pin modular cable (Modem version only)

8-pin to 8-pin modular cable

8-pin modular to DB-9 female connector

Two 4-position terminal lug connectors

3-position terminal lug connector

Advertising
This manual is related to the following products: