Required test equipment, Procedure, Required test equipment -33 – Agilent Technologies E4438C User Manual

Page 125: Procedure -33

Advertising
background image

Adjustments

ALC Calibration

4- 33

Required Test Equipment

• Agilent E4418B E-Series power meter

• Agilent E9304A E-Series power sensor

Procedure

Figure 4-25

ALC Calibration Setup

1. Connect the equipment as shown above.

2. Preset all of the equipment.

3. Follow the instructions as they appear on the controller’s display.

Advertising