Chapter 3 - Commissioning

BreezeACCESS VL System Manual

80

3.5

Operation Verification

The following sections describe how to verify the correct functioning of the
Outdoor Unit, Indoor Unit, Ethernet connection and data connectivity.

3.5.1 Outdoor Unit Verification

To verify the correct operation of the Outdoor Unit, examine the LED indicators
located on the bottom panel of the outdoor unit.

The following tables list the provided LEDs and their associated indications.

NOTE

Verifying the correct operation of the Outdoor Unit using the LEDs, as described below, is only
possible after the configuration and alignment processes are completed.

Table 3-4: AU-ODU LEDs

Name

Description

Functionality

W-LINK

Wireless Link

Indictor

„ Green – Unit is associated with one or

more SUs

„ Blinking red – No associations

„ Off – Wireless link is disabled

Status

Self-test and power

indication

„ Green – Power is available and

self-test passed.

„ Blinking Amber – Testing (not ready for

operation)

„ Red – Self-test failed – fatal error

ETH

Ethernet activity/

connectivity

indication

„ Green –Ethernet link detected.

„ Amber – No Ethernet connectivity between

the indoor and outdoor units.