Continuity measurement -3, Current measurement (dc) -3 – JLG 3246ES Service Manual User Manual

Page 179

Advertising
background image

SECTION 7 - GENERAL ELECTRICAL INFORMATION & SCHEMATICS

3121166

– JLG Lift –

7-3

Continuity Measurement

Current Measurement

Figure 7-3. Continuity Measurement

Figure 7-4. Current Measurement (DC)

• Some meters require a separate button press to

enable audible continuity testing

• Circuit power must be turned OFF before testing

continuity

• Disconnect component from circuit before testing

• Use firm contact with meter leads

• First test meter and leads by touching leads

together. Meter should produce an audible alarm,
indicating continuity

• Set up the meter for the expected current range

• Be sure to connect the meter leads to the correct

jacks for the current range you have selected

• If meter is not auto ranging, set it to the correct

range (See multi meter’s operation manual)

• Use firm contact with meter leads

Advertising
This manual is related to the following products: