6 preventive maintenance and inspection schedule, Preventive maintenance and inspection schedule -6 – JLG 3246ES Service Manual User Manual

Page 34

Advertising
background image

SECTION 2 - GENERAL

2-6

– JLG Lift –

3121166

2.6

PREVENTIVE MAINTENANCE AND INSPECTION
SCHEDULE

The preventive maintenance and inspection checks are
listed and defined in the following table. This table is
divided into two basic parts, the “AREA” to be inspected
and the “INTERVAL” at which the inspection is to take
place. Under the “AREA” portion of the table, the various
systems along with the components that make up that
system are listed. The “INTERVAL” portion of the table is
divided into five columns representing the various
inspection time periods. The numbers listed within the
interval column represent the applicable inspection
code for which that component is to be checked.

The checks and services listed in this schedule are not
intended to replace any local or regional regulations
that may pertain to this type of equipment nor should
the lists be considered as all inclusive. Variances in inter-
val times may occur due to climate and/or conditions
and depending on the location and use of the machine.

NOTICE

JLG INDUSTRIES REQUIRES THAT A COMPLETE ANNUAL INSPEC-
TION BE PERFORMED IN ACCORDANCE WITH THE "ANNUAL
MACHINE INSPECTION REPORT" FORM.

NOTE: This machine requires periodic safety and mainte-

nance inspections by a JLG Dealer. Notify dealer if
inspection is overdue.

The inspection and maintenance code numbers are as
follows:

1.

Check for proper and secure installation.

2.

Check for visible damage and legibility.

3.

Check for proper fluid level.

4.

Check for any structural damage; cracked or bro-
ken welds; bent or warped surfaces.

5.

Check for leakage.

6.

Check for presence of excessive dirt or foreign
material.

7.

Check for proper operation and freedom of move-
ment.

8.

Check for excessive wear or damage.

9.

Check for proper tightness and adjustment.

10.

Drain, clean and refill.

11.

Check for proper operation while pump/motor is
running.

12.

Check for proper lubrication.

13.

Check for evidence of scratches, nicks or rust and
for straightness of rod.

14.

Check for condition of element; replace as neces-
sary.

15.

Check for proper inflation.

Advertising
This manual is related to the following products: