Main gearbox disassembly, Main gearbox disassembly -12 – JLG 3246ES Service Manual User Manual

Page 48

Advertising
background image

SECTION 3 - CHASSIS & SCISSOR ARMS

3-12

– JLG Lift –

3121166

Main Gearbox Disassembly

1.

Using a screwdriver, pry off the cover snap ring.

2.

Remove cover. Cover Thrust washer should be in
the inner counter bore of the cover.

NOTE: To grip the cover for removal a pipe may need to be

inserted into the pipe plug holes.

3.

Remove input sun gear.

4.

Remove input carrier sub-assembly.

5.

Remove cover o-ring.

6.

Remove input ring gear.

NOTE: The input ring gear is held in with a press fit on its

outside diameter. Insert jacking screws (1/4-20UNC
grade 8) with at least 1.5 inches of thread length into

each of the three tapped holes to force the ring gear
out. Be sure and alternate between the jacking
screws to keep the ring gear from becoming mis-
aligned in the bore. The screws will push against the
outer race of the main bearing. This bearing will have
to be replaced afterwards.

7.

Using a screwdriver remove spiral snap ring.

8.

Pull hub sub-assembly off of the spindle sub-
assembly.

1.

Spindle Sub-Assembly

2.

Spiral Snap Ring

3.

Input ring Gear

4.

Input Sun Gear

5.

Cover O-Ring

6.

Cover Thrust Washer

7.

Cover

8.

Cover Snap Ring

9.

Pipe Plug

10.

Input Carrier Sub-Assembly

11.

Hub Sub-Assembly

Figure 3-11. Main Gearbox Disassembly

Advertising
This manual is related to the following products: