Caron 6017 User Manual

Page 14

Advertising
background image

6010 Series Operations Manual

Rev E 2/14/2012

Page 14 of 68

Stacking two Units

The CARON 6010 family is designed to allow two units to be stacked. When units are

stacked they must be bolted together for safety. A stacking adaptor kit, STCK301 with

instructions is available through CARON customer service.

Leveling the Unit

Place a level on the middle shelf of the environmental chamber. Adjust the cabinet

leveling feet so the shelf is level. Units equipped with optional casters (CSTR101) can

be leveled by adjusting the height of the lock nut on the caster. Adjust the feet or

casters appropriately until the unit sits level left to right and front to back.

Connecting the Drain Line

The chamber drain connection is located in the bottom middle of the back of the

chamber. A 3/8” NPT fitting and tubing are supplied in the unit parts kit. Thread the

fitting into the drain connection and slide the tubing into the drain connection. Pull on

the tubing after installation to make sure it is tight. Route the drain tubing to a local floor

drain.

When using a pressurized water source, failure

to connect the unit to a drain could result in

facility flooding.

Failure to install the stacking adaptor kit can

result in the top unit falling causing serious

injury or death.

Do not have multiple loaded shelves out

simultaneously or the chamber may tip.

Advertising
This manual is related to the following products: