MTS Series 793 User Manual

Page 453

Advertising
background image

change units as desired while creating a test procedure file. Existing test procedures always open with
the saved units.

More about units and the Station Builder application

When creating a new station, you can assign a dimension and display units for the following station resources:

Control Modes

Stabilization

Inputs

Auxiliary Inputs

External Command

Calculated Outputs

Ensure that the dimensions and units for these selections are consistent.

More about units and the Project Manager application

After installation, the Project Manager application is the best place to make a universal change to the default
unit assignment set. To change the unit set:

1. Select Tools > Project Settings.

2. Select Default Unit Set.

3. Select the unit set you want to change to from the drop-down menu.

4. Click OK.

MTS Series 793 Control Software 453

Working With Units