2 - quick start, Required tools, Chapter 2 – Rockwell Automation 1746-INT4 Thermocouple/MV Isolated/ User Manual User Manual

Page 17: Quick start, Chapter

Advertising
background image

17

Publication 1746-UM614B-EN-P - September 2007

Chapter

2

Quick Start

Use this chapter as an abbreviated procedure for getting the module
into operation or as an overview if you need the additional steps
described in subsequent chapters. This chapter assumes that you
understand the following things:

SLC 500 products

Electronic process control

Ladder logic instructions

Because this chapter is a start-up guide, it does not contain detailed
explanations. It does, however, refer to other chapters or to other SLC
publications for more information.

If you are unsure of terms used or concepts presented in this chapter,
always read the referenced chapters before trying to apply the
information.

This chapter describes:

what equipment you need.

how to install and wire the module.

how to set up one channel for thermocouple input.

the state of the LED indicators at normal start-up.

the channel status word.

Required Tools

Have the following tools and equipment ready:

Medium blade screwdriver

Medium cross-head screwdriver

Thermocouple or millivolt sensor

Thermocouple extension wire (if needed)

The module

I/O chassis

SLC processor and power supply

Programming software

Advertising