Interconnecting terminal base units – Rockwell Automation 1440-SPD02-01RB XM-220 Dual Speed Module User Manual

Page 23

Advertising
background image

Publication GMSI10-UM004B-EN-P - May 2010

Installing the XM-220 Dual Speed Module 15

3. Rotate the terminal base onto the DIN rail with the top of the rail

hooked under the lip on the rear of the terminal base.

4. Press down on the terminal base unit to lock the terminal base on the

DIN rail. If the terminal base does not lock into place, use a screwdriver
or similar device to open the locking tab, press down on the terminal
base until flush with the DIN rail and release the locking tab to lock the
base in place.

Interconnecting Terminal Base Units

Follow the steps below to install another terminal base unit on the DIN rail.

1. Position the terminal base on the 35 x 7.5mm DIN rail (A).

2. Make certain the side connector (B) is fully retracted into the base unit.

3. Slide the terminal base unit over tight against the neighboring terminal

base. Make sure the hook on the terminal base slides under the edge of
the terminal base unit.

4. Press down on the terminal base unit to lock the terminal base on the

DIN rail. If the terminal base does not lock into place, use a screwdriver
or similar device to open the locking tab, press down on the terminal
base until flush with the DIN rail and release the locking tab to lock the
base in place.

IMPORTANT

Make certain you install the terminal base units in order of
left to right.

Advertising