Module indicators – Rockwell Automation 1440-SPD02-01RB XM-220 Dual Speed Module User Manual

Page 48

Advertising
background image

Publication GMSI10-UM004B-EN-P - May 2010

40 Installing the XM-220 Dual Speed Module

1. Make certain the keyswitch (A) on the terminal base unit (C) is at

position 4 as required for the module.

2. Make certain the side connector (B) is pushed all the way to the left. You

cannot install the module unless the connector is fully extended.

3. Make sure that the pins on the bottom of the module are straight so they

will align properly with the connector in the terminal base unit.

4. Position the module (D) with its alignment bar (E) aligned with the

groove (F) on the terminal base.

5. Press firmly and evenly to seat the module in the terminal base unit. The

module is seated when the latching mechanism (G) is locked into the
module.

6. Repeat the above steps to install the next module in its terminal base.

Module Indicators

The XM-220 module has seven LED indicators, which include a module status
(MS) indicator, a network status (NS) indicator, a status indicator for each
channel (CH1 and CH2), an activation indicator for startup, a status indicator
for the Relay, and an indicator (AUX) reserved for future use. The LED
indicators are on top of the module.

Advertising