To implement the cool down phase, five additional parameters must be entered. These are discussed
in the next section. If you do not wish to activate the cool down phase press INC. the display will
show:


You can now define for step 1 whether the load balancing is enabled. Load balancing is essentially
a modulated fill. A target temperature can be programmed and the machine will use a combination
of the hot water fill valve and the cold water fill valve to maintain a given temperature. If you wish
to activate temperature controlled fill, press ENTER. The display will change to:


To implement temperature controlled fill, four additional parameters must be entered. These are
discussed in the next section. If controlled fill, press INC. The display will:


To activate the Drain and end Step 1, press ENTER, pressing INC or DEC will scroll through the
other functions to end the step. The step can end with a Drain, a Water Level, a Water Temperature,
or an elapsed Time. Selecting on of the functions by pressing ENTER changes the display and
prompts you to enter a value for the particular function.

EXAMPLE:


ENTER



Type the required value in using the numerical keypad and press ENTER. In the event that you
choose a level or a temperature to end the step, you will be prompted with:


This is the Watch Dog Timer. Press ENTER to set the value.


Set the time in minutes, press ENTER


Set the time in seconds, press ENTER. This timer provides a time in which the temperature or
water level you have programmed can be reached. If the level or temperature cannot be reached in
the given amount of time, the wash program will continue. Be sure do enter a time that is
reasonably longer than the presumed time for filling or heating.

BALLOAD? NO

BALLAD? NO

DRAIN? NO

LEVEL NO

LEVEL = cm

WDT = NO

WDT = m

WDT = s